Plouigneau

Construction

The wind farm is being developed with our partner Green Venture Capital (Finavent). The application for the building permit was submitted on 01/03/2007 to the local Prefect and it is currently being considered. Prior to submitting the application, extensive studies were conducted in order to configure the wind farm in an optimum way to minimize the impact of the project on the local environment. These studies include bird and bat, landscape and noise studies with local and well respected experts. Particular attention has been focused on avoiding protected nature areas and for developing a project in conformity with all the regulations surrounding such protected areas. The project will be built using state-of-the-art turbines, each with capacity over 2 MW and an expected commercial operation date in the second half of 2009.